Permit Running
By allowing Southern Elite to efficiently manage the permit running process, you can minimize delays and ensure your project progresses smoothly and compliantly.
Determine Permit Types:
Identify the permits needed for your project, which may include:Building permits
Electrical, plumbing, or mechanical permits
Environmental permits (e.g., erosion control, wetlands, or stormwater management)
Zoning and land-use permits
Demolition permits
Consult Authorities:
Reach out to local building departments, zoning offices, or environmental agencies to clarify requirements.Review Codes and Regulations:
Familiarize yourself with local building codes, safety standards, and environmental laws.
2. Preparing Permit Applications
Gather Required Documents:
Common documents needed include:Site plans and architectural drawings
Structural engineering reports
Land surveys
Environmental impact assessments
Proof of ownership or property leases
Hire Professionals (if needed):
Engage architects, engineers, or consultants to prepare accurate and compliant documentation.Complete Application Forms:
Fill out all forms required by the permitting authority, ensuring all information is accurate and complete.
3. Submitting Applications
Online or In-Person Submission:
Submit your application through the designated platform or in person at the permitting office.Pay Fees:
Permit applications often require processing fees. These vary by jurisdiction and project scope.Track Submission:
Keep records of application submissions and tracking numbers for follow-up.
4. Review and Approval Process
Preliminary Review:
The permitting authority checks for completeness and compliance with basic requirements.Technical Review:
Specialists may review engineering details, environmental impacts, or safety compliance.Public Hearings (if applicable):
Some permits, especially for large-scale or controversial projects, may require public input.Corrections and Resubmissions:
Address any comments or requested modifications from the reviewing authority promptly.
5. Permit Issuance
Receive the Permit:
Once approved, you’ll receive the official permit documents.Post Permit On-Site:
Many jurisdictions require permits to be displayed visibly on the construction site.
6. Inspections During Construction
Schedule Inspections:
Most permits require periodic inspections to ensure ongoing compliance.Foundation inspections
Framing inspections
Utility inspections (e.g., plumbing, electrical)
Final inspection
Address Issues:
Resolve any issues identified during inspections to avoid project delays.
7. Permit Closeout
Final Approval:
After all inspections are passed, the authority issues a certificate of occupancy or completion.Record Keeping:
Retain copies of permits and inspection records for future reference.
Best Practices for Permit Running
Start Early: Permitting can be time-consuming, so initiate the process as soon as project plans are developed.
Communicate Regularly: Maintain open lines of communication with permitting authorities and stakeholders.
Hire Specialists: Use permit runners or expediters for complex projects or jurisdictions with strict requirements.
Stay Updated: Keep track of changes in codes and regulations that could affect your permits.
O